Selling or renting property in Thailand? Contact buyers direct
on th-property.com's Property Marketing Network.
No sales commission - only a small advertising fee.
Baan Suan Mok (Jasmin Gardens) lies 7 kms from Hua Hin centre, and offers this super villa on plot #4, a medium-sized plot of land with plenty of space for swimming pool and garden. The house has a nice entrance into a huge living/dining room with French doors opening onto the veranda, and a fabuous hardwood and granite kitchen with adjoining utility room. There's space for a bar or office, or extended utility room. All 3 bedrooms have their bathrooms ensuite. The master is the largest bedroom and could have direct access to the veranda and pool via an optional door. The house is equipped with 3-phase electrics, 4 air-conditioners, 4 water heaters and telephone/ADSL connections are made ready for subscription. Baan Suan Mok villas are heavy guage constructions with shingle tile roofs, high-spec electrical systems and custom finishings installed and applied with care. Gardens are levelled, grassed and surrounded by white pickett fences and jasmin hedgerows, and swimming pools are made fully functional before buyers move in. Come to Baan Suan Mok and see for yourself the three houses here already, developed and maintained by TH-property. It takes seven months to build and finish a house like this, and of course the buyer has the opportunity to choose all finishing materials including floor and wall tiles, granites for kitchen and bathrooms, wood type and colour and sanitary ware. This illustration shows a swimming pool of 8m by 4m with 2.5m dia. spa which is included in the price. Baan Suan Mok is located only 6 kms (10 minutes by car) from downtown Hua Hin, halfway between the beaches and the golf courses. The village of Wat Nikro offers shops and eateries as well as bus and taxi services. How to Buy: This house is not yet built, so this purchase uses a stage-payment system. The contract of sale and purchase describes in detail the construction, installations and finishings to be carried out. The first payment is 30%. Construction starts and is monitored and documented throughout. Three more payments of 20% are made and all should be finished. Final payment of 10% is made at time of transfer.